After countless years of reliable service, Southern Golf Club upgraded their existing P075 Rooftop Package. The club’s extensive opening hours meant minimal down time was crucial, APAC delivered a quick and smooth changeover with minor disruptions.
A direct replacement P075 perfectly matched the existing footprint, electrical entries, supply/return air and condensate drain connections. No costly changes were made to the roof platform or structural elements of the building.
From the time the crane started up and the existing unit was off the roof, the new unit was up and running in less than 60 minutes. Best of all, Southern Golf Club can expect to save over 22% in running costs with low operating noise levels.